Lifting the Standard: A Smart Cover Solution for Operational Ease

Client: Engineering Client
Location: Essex  
Project: Cover Replacement 

 

Project Overview 

Our customer faced a critical need for a cover replacement at a sewage treatment site, with the existing cover deemed inefficient and difficult to handle. The current cover was heavy and challenging to lift, making it unsuitable for single-person operation. This posed an operational challenge that needed to be addressed promptly for improved efficiency. 

The location of the cover itself added complexity to the task. An overhead gantry used for lifting pumps out of the chamber and a junction box station’s legs were in close proximity to the cover, making both design and installation challenging. The customer required a new solution that would be easy to operate and fit seamlessly into this tight and tricky space. 

 

Solution 

Collaborating closely with our client, the Brickhouse team conducted a thorough survey of the site to assess the conditions and specific design requirements. This allowed us to develop a tailored solution that addressed the customer’s needs while overcoming the space and installation constraints. 

To meet the high standards required, we selected the Steelway Brickhouse Upstanding Cover - a water-shedding, Hinged Assisted Lift Access Cover that is well-regarded for its durability, ease of operation and suitability for single-person handling. The design of the upstanding cover was critical in ensuring a secure fit while also making it easier to manage, aligning perfectly with the operational requirements of the site. 

After manufacturing the bespoke cover, our client completed a flawless installation, ensuring that the cover was perfectly fitted and would provide long-term, reliable service. This efficient, precision-engineered solution not only improved operational efficiency but also enhanced safety by allowing easier access and maintenance. 

 

Technical Efficiency & Collaboration 

The success of this project hinged on our technical efficiency in understanding the complex requirements of the site and providing an engineered solution that met both practical and operational needs. Through strategic planning, precise measurements and expert collaboration, we were able to deliver a solution that not only met the customer’s needs but exceeded expectations in terms of safety and reliability. 

Daniel Patrick - Internal Sales said: 


"The intricacies of our customer's requirements provided an excellent opportunity to apply our expertise. We ensured that the tailored cover met every specification and could be easily operated by a single person. By selecting the upstanding unit, we offered a solution that addressed the specific site challenges. The seamless collaboration with our client gave us the confidence to propose a custom product that was installed to the highest standards." 

This project is a testament to the power of collaboration, precision engineering and high-quality product solutions in overcoming infrastructure challenges. Through careful planning and technical expertise, we were able to deliver a customised, efficient solution that ensures both safety and operational continuity for our customer in Braintree. 

 

If your project requires a new or replacement access cover, our Sales team is ready to assist with expert advice and tailored solutions. Contact us today to discuss your requirements. 

 
Call: 0121 521 4500 | Email: sales@steelwaybrickhouse.co.uk 

 

 

No items found.
Copyright Steelway Fensecure Ltd 2023. All Rights Reserved. Steelway is part of the Northern Industries Family
Website by Gravitas

Lifting the Standard: A Smart Cover Solution for Operational Ease

Client: Engineering Client
Location: Essex  
Project: Cover Replacement 

 

Project Overview 

Our customer faced a critical need for a cover replacement at a sewage treatment site, with the existing cover deemed inefficient and difficult to handle. The current cover was heavy and challenging to lift, making it unsuitable for single-person operation. This posed an operational challenge that needed to be addressed promptly for improved efficiency. 

The location of the cover itself added complexity to the task. An overhead gantry used for lifting pumps out of the chamber and a junction box station’s legs were in close proximity to the cover, making both design and installation challenging. The customer required a new solution that would be easy to operate and fit seamlessly into this tight and tricky space. 

 

Solution 

Collaborating closely with our client, the Brickhouse team conducted a thorough survey of the site to assess the conditions and specific design requirements. This allowed us to develop a tailored solution that addressed the customer’s needs while overcoming the space and installation constraints. 

To meet the high standards required, we selected the Steelway Brickhouse Upstanding Cover - a water-shedding, Hinged Assisted Lift Access Cover that is well-regarded for its durability, ease of operation and suitability for single-person handling. The design of the upstanding cover was critical in ensuring a secure fit while also making it easier to manage, aligning perfectly with the operational requirements of the site. 

After manufacturing the bespoke cover, our client completed a flawless installation, ensuring that the cover was perfectly fitted and would provide long-term, reliable service. This efficient, precision-engineered solution not only improved operational efficiency but also enhanced safety by allowing easier access and maintenance. 

 

Technical Efficiency & Collaboration 

The success of this project hinged on our technical efficiency in understanding the complex requirements of the site and providing an engineered solution that met both practical and operational needs. Through strategic planning, precise measurements and expert collaboration, we were able to deliver a solution that not only met the customer’s needs but exceeded expectations in terms of safety and reliability. 

Daniel Patrick - Internal Sales said: 


"The intricacies of our customer's requirements provided an excellent opportunity to apply our expertise. We ensured that the tailored cover met every specification and could be easily operated by a single person. By selecting the upstanding unit, we offered a solution that addressed the specific site challenges. The seamless collaboration with our client gave us the confidence to propose a custom product that was installed to the highest standards." 

This project is a testament to the power of collaboration, precision engineering and high-quality product solutions in overcoming infrastructure challenges. Through careful planning and technical expertise, we were able to deliver a customised, efficient solution that ensures both safety and operational continuity for our customer in Braintree. 

 

If your project requires a new or replacement access cover, our Sales team is ready to assist with expert advice and tailored solutions. Contact us today to discuss your requirements. 

 
Call: 0121 521 4500 | Email: sales@steelwaybrickhouse.co.uk 

 

 

No items found.
+44 (0) 1902 490 919

sales@fensecure.co.uk

Queensgate Works,Bilston Road,
Wolverhampton,West Midlands,WV2 2NJ
Copyright Steelway Fensecure Ltd 2023. All Rights Reserved. Steelway is part of the Northern Industries Family
Website by Gravitas

Lifting the Standard: A Smart Cover Solution for Operational Ease

Client: Engineering Client
Location: Essex  
Project: Cover Replacement 

 

Project Overview 

Our customer faced a critical need for a cover replacement at a sewage treatment site, with the existing cover deemed inefficient and difficult to handle. The current cover was heavy and challenging to lift, making it unsuitable for single-person operation. This posed an operational challenge that needed to be addressed promptly for improved efficiency. 

The location of the cover itself added complexity to the task. An overhead gantry used for lifting pumps out of the chamber and a junction box station’s legs were in close proximity to the cover, making both design and installation challenging. The customer required a new solution that would be easy to operate and fit seamlessly into this tight and tricky space. 

 

Solution 

Collaborating closely with our client, the Brickhouse team conducted a thorough survey of the site to assess the conditions and specific design requirements. This allowed us to develop a tailored solution that addressed the customer’s needs while overcoming the space and installation constraints. 

To meet the high standards required, we selected the Steelway Brickhouse Upstanding Cover - a water-shedding, Hinged Assisted Lift Access Cover that is well-regarded for its durability, ease of operation and suitability for single-person handling. The design of the upstanding cover was critical in ensuring a secure fit while also making it easier to manage, aligning perfectly with the operational requirements of the site. 

After manufacturing the bespoke cover, our client completed a flawless installation, ensuring that the cover was perfectly fitted and would provide long-term, reliable service. This efficient, precision-engineered solution not only improved operational efficiency but also enhanced safety by allowing easier access and maintenance. 

 

Technical Efficiency & Collaboration 

The success of this project hinged on our technical efficiency in understanding the complex requirements of the site and providing an engineered solution that met both practical and operational needs. Through strategic planning, precise measurements and expert collaboration, we were able to deliver a solution that not only met the customer’s needs but exceeded expectations in terms of safety and reliability. 

Daniel Patrick - Internal Sales said: 


"The intricacies of our customer's requirements provided an excellent opportunity to apply our expertise. We ensured that the tailored cover met every specification and could be easily operated by a single person. By selecting the upstanding unit, we offered a solution that addressed the specific site challenges. The seamless collaboration with our client gave us the confidence to propose a custom product that was installed to the highest standards." 

This project is a testament to the power of collaboration, precision engineering and high-quality product solutions in overcoming infrastructure challenges. Through careful planning and technical expertise, we were able to deliver a customised, efficient solution that ensures both safety and operational continuity for our customer in Braintree. 

 

If your project requires a new or replacement access cover, our Sales team is ready to assist with expert advice and tailored solutions. Contact us today to discuss your requirements. 

 
Call: 0121 521 4500 | Email: sales@steelwaybrickhouse.co.uk 

 

 

No items found.
Copyright Steelway Fensecure Ltd 2023. All Rights Reserved. Steelway is part of the Northern Industries Family
Website by Gravitas

Lifting the Standard: A Smart Cover Solution for Operational Ease

Client: Engineering Client
Location: Essex  
Project: Cover Replacement 

 

Project Overview 

Our customer faced a critical need for a cover replacement at a sewage treatment site, with the existing cover deemed inefficient and difficult to handle. The current cover was heavy and challenging to lift, making it unsuitable for single-person operation. This posed an operational challenge that needed to be addressed promptly for improved efficiency. 

The location of the cover itself added complexity to the task. An overhead gantry used for lifting pumps out of the chamber and a junction box station’s legs were in close proximity to the cover, making both design and installation challenging. The customer required a new solution that would be easy to operate and fit seamlessly into this tight and tricky space. 

 

Solution 

Collaborating closely with our client, the Brickhouse team conducted a thorough survey of the site to assess the conditions and specific design requirements. This allowed us to develop a tailored solution that addressed the customer’s needs while overcoming the space and installation constraints. 

To meet the high standards required, we selected the Steelway Brickhouse Upstanding Cover - a water-shedding, Hinged Assisted Lift Access Cover that is well-regarded for its durability, ease of operation and suitability for single-person handling. The design of the upstanding cover was critical in ensuring a secure fit while also making it easier to manage, aligning perfectly with the operational requirements of the site. 

After manufacturing the bespoke cover, our client completed a flawless installation, ensuring that the cover was perfectly fitted and would provide long-term, reliable service. This efficient, precision-engineered solution not only improved operational efficiency but also enhanced safety by allowing easier access and maintenance. 

 

Technical Efficiency & Collaboration 

The success of this project hinged on our technical efficiency in understanding the complex requirements of the site and providing an engineered solution that met both practical and operational needs. Through strategic planning, precise measurements and expert collaboration, we were able to deliver a solution that not only met the customer’s needs but exceeded expectations in terms of safety and reliability. 

Daniel Patrick - Internal Sales said: 


"The intricacies of our customer's requirements provided an excellent opportunity to apply our expertise. We ensured that the tailored cover met every specification and could be easily operated by a single person. By selecting the upstanding unit, we offered a solution that addressed the specific site challenges. The seamless collaboration with our client gave us the confidence to propose a custom product that was installed to the highest standards." 

This project is a testament to the power of collaboration, precision engineering and high-quality product solutions in overcoming infrastructure challenges. Through careful planning and technical expertise, we were able to deliver a customised, efficient solution that ensures both safety and operational continuity for our customer in Braintree. 

 

If your project requires a new or replacement access cover, our Sales team is ready to assist with expert advice and tailored solutions. Contact us today to discuss your requirements. 

 
Call: 0121 521 4500 | Email: sales@steelwaybrickhouse.co.uk 

 

 

No items found.
+44 (0) 1902 921 525

protect@steelway.co.uk

Brickhouse Lane, West Bromwich,
West Midlands, B70 0DY
Copyright Steelway Fensecure Ltd 2023. All Rights Reserved. Steelway is part of the Northern Industries Family
Website by Gravitas

Lifting the Standard: A Smart Cover Solution for Operational Ease

Client: Engineering Client
Location: Essex  
Project: Cover Replacement 

 

Project Overview 

Our customer faced a critical need for a cover replacement at a sewage treatment site, with the existing cover deemed inefficient and difficult to handle. The current cover was heavy and challenging to lift, making it unsuitable for single-person operation. This posed an operational challenge that needed to be addressed promptly for improved efficiency. 

The location of the cover itself added complexity to the task. An overhead gantry used for lifting pumps out of the chamber and a junction box station’s legs were in close proximity to the cover, making both design and installation challenging. The customer required a new solution that would be easy to operate and fit seamlessly into this tight and tricky space. 

 

Solution 

Collaborating closely with our client, the Brickhouse team conducted a thorough survey of the site to assess the conditions and specific design requirements. This allowed us to develop a tailored solution that addressed the customer’s needs while overcoming the space and installation constraints. 

To meet the high standards required, we selected the Steelway Brickhouse Upstanding Cover - a water-shedding, Hinged Assisted Lift Access Cover that is well-regarded for its durability, ease of operation and suitability for single-person handling. The design of the upstanding cover was critical in ensuring a secure fit while also making it easier to manage, aligning perfectly with the operational requirements of the site. 

After manufacturing the bespoke cover, our client completed a flawless installation, ensuring that the cover was perfectly fitted and would provide long-term, reliable service. This efficient, precision-engineered solution not only improved operational efficiency but also enhanced safety by allowing easier access and maintenance. 

 

Technical Efficiency & Collaboration 

The success of this project hinged on our technical efficiency in understanding the complex requirements of the site and providing an engineered solution that met both practical and operational needs. Through strategic planning, precise measurements and expert collaboration, we were able to deliver a solution that not only met the customer’s needs but exceeded expectations in terms of safety and reliability. 

Daniel Patrick - Internal Sales said: 


"The intricacies of our customer's requirements provided an excellent opportunity to apply our expertise. We ensured that the tailored cover met every specification and could be easily operated by a single person. By selecting the upstanding unit, we offered a solution that addressed the specific site challenges. The seamless collaboration with our client gave us the confidence to propose a custom product that was installed to the highest standards." 

This project is a testament to the power of collaboration, precision engineering and high-quality product solutions in overcoming infrastructure challenges. Through careful planning and technical expertise, we were able to deliver a customised, efficient solution that ensures both safety and operational continuity for our customer in Braintree. 

 

If your project requires a new or replacement access cover, our Sales team is ready to assist with expert advice and tailored solutions. Contact us today to discuss your requirements. 

 
Call: 0121 521 4500 | Email: sales@steelwaybrickhouse.co.uk 

 

 

No items found.

CEL Sheet Metal Ltd is a UK based sheet metal and assembly business, offering a variety of services that can effectively replace your existing sub-contract manufacturing requirements.

+44 (0) 1952 200 741
sales@celsheetmetal.com
Stafford Park 11
Telford
Shropshire
TF3 3AY
Copyright CEL Sheetmetal ltd 2023. All Rights Reserved.   Privacy Policy   |    Terms of Service    |    Website by Gravitas